Factory Low Price Stainless Steel Carbon Steel Pipe Elbow

Product Details
Customization: Available
Connection: Male and Female
Shape: Equal and Reducing
Still deciding? Get samples of US$ 0/Piece
Request Sample

360° Virtual Tour

Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
27
Year of Establishment
2009-04-24
  • Factory Low Price Stainless Steel Carbon Steel Pipe Elbow
  • Factory Low Price Stainless Steel Carbon Steel Pipe Elbow
  • Factory Low Price Stainless Steel Carbon Steel Pipe Elbow
  • Factory Low Price Stainless Steel Carbon Steel Pipe Elbow
  • Factory Low Price Stainless Steel Carbon Steel Pipe Elbow
  • Factory Low Price Stainless Steel Carbon Steel Pipe Elbow
Find Similar Products
  • Overview
  • Detailed Photos
Overview

Basic Info.

Model NO.
3/8"-4"
Head Code
Square or Hexagon or Round
Angle
All
Wall Thickness
Sch10/Scan20/Sch40/Other
Material
Carbon Steel
Technics
Forged
Certification
ANSI, DIN, BS
Color
Silver
Transport Package
Box
Specification
3/8′′--4′′ pipe/other size
Trademark
TFCO
Origin
Tianjin China
Production Capacity
20000ton/Year

Product Description

Overview
Quick Details
Material
Malleable Iron
Maximum Pressure
25 BAR (363PSI) (2.5MPA) CLASS 150
Maximum Temperature
200°C (392°F)
Tensile Strength
350MPA
Hardness
HB150 (Brinell)
Elongation Rate
10%
Suitable Applications
Water, Oil, Gas, Petro-Chemical
Standard
EN10242 / ANSI / ASME B16.3 / DIN2950 / IS0 49 / NBR6943 / IS1879 / BS EN10242
Threaded Standard
EN10226 / ASME B.1.20.1 / DIN2999 / ISO7-1 / ISO228 / IS554 / BS EN10226
Work Pressures
PN25 / 2.5Mpa / 363PSI /CLASS 150 / 25Bar
Packing Details
Cartons with/without pallets, Double woven bags, 
Or according to the buyer's requirements.
Delivery Details
According to the quantities and specifications of each order. 
Normal delivery times are from 30 to 45 days after receiving the deposit.
Shipping Ways
By sea, it is convenient for bulk orders. 
Cheap shipping cost, usually takes 30-60 days.
By air, quick delivery, for not very heavyweight orders. 
Cheaper than Express. Takes around 7-12 days.
By express, samples, and small order. 
A little expensive, but very quickly, usually 7-10 days, door to door.
 
Detailed Photos
Factory Low Price Stainless Steel Carbon Steel Pipe Elbow
Factory Low Price Stainless Steel Carbon Steel Pipe Elbow
Factory Low Price Stainless Steel Carbon Steel Pipe Elbow
Factory Low Price Stainless Steel Carbon Steel Pipe Elbow
Factory Low Price Stainless Steel Carbon Steel Pipe Elbow
Factory Low Price Stainless Steel Carbon Steel Pipe Elbow

 

Packing & Delivery
Factory Low Price Stainless Steel Carbon Steel Pipe Elbow
Our Honor
Factory Low Price Stainless Steel Carbon Steel Pipe Elbow
Our Team
Factory Low Price Stainless Steel Carbon Steel Pipe Elbow
Our company

Tianjin Friend Steel Group with "TFCO" Brand has 5 subsidiary compainies include Tianjin Friend Steel Pipe Co.,Ltd.Tianjin Steel Galvanization Co.,Ltd.Tianjin Friend Metal Material Co.,Ltd.Tianjin Friend Import&Export Co., Ltd.Tianjin Steel Import&Export Co., Ltd. Built in 1999 with registered capital of RMB 30 million, we have an annual production capacity of 400,000 MT and exporting quatity of 60,000MT .

 

As a professional manufactrer of steel products, we focus on the production of high-frequency welded pipes, galvanized steel pipes and scaffolding products. Also other steel products can supplied by our trading company such as Longitudinally Submerged Arc Welding and Spiral Submerged Arc Welding tube,API Line pipe,Steel Coil,Steel Sheet,Steel Angle,U beam,I beam and etc. 

 

For over 15 years export experience, we have clients throughout China and Mideast,Southeast Asia, Australia, UK, America. Product quality is guaranteed, and almost all kinds of products are on-hand in stock in any given time. Special requirements of customers  can be handled; moreover, we can also use imported materials for customized processing.

 

Also, we have a devoted and enthusiastic after-sales service team. Practical system for goods delivery, invoicing, settlement, transportation and goods storage can be provided.  We promise prompt delivery of customers' exact orders.

 

Solid network of business connections with global enterprises has been established. We are eagerly looking forward to cooperating with you. Our philosophy is "Honor the contract and keep promises; Searching for development with high quality; Serving guests with credibility".
Factory Low Price Stainless Steel Carbon Steel Pipe Elbow

FAQ
1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container, mixed  products are acceptable. We can produce as per your quantity based on different products. Please feel free to contact us, let's discuss furtherly. 


2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted). For steel pipes, we pack by steel strips with 61 pieces in bundle. Steel plan, steel frame, and steel prop are packed by steel strips in bundle. Couplers are in pallet. 


3. Q: What's your delivery time?
A: 10-30 days after received the advance payment. For stel pipe, we can arrange shipment within 10-20 days usualy we have steel pipe in production line. For steel plank, steel prop and scaffolding frame, which need further welding, it takes 30 days. We will try our best to arrange shippment asap. Also we can arrange partial shipment based on your quantity.


4. Q: Are you manufacturer or trader?
A: We are a professional steel product manufacturer with more than 15 years of export experience. We have our own factories, one is for steel pipe, one is for galvanization, another is for scaffolding, such as steel plank, steel prop and steel frame. We have over 100  workers, with 5 welding line. Our products are exporting to Southeast and Mideast Asia, EU market. With our own factories, we can control the production cost and delivery time better. And provide you high quality goods with moderate price.

5. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing), close to Tianjin Port. Our factory  is located in the biggest steel industrial zone in China, with the steel industrial concentration, we can get raw material and fittings very fast, and arrange shipment ealrier.

6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case. It is helpful to know better about our factory. We can also do the remote inspection based on current coronavirus situation.

7. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials, such as scaffold tube, steel plank, scaffolding frame. scaffolding couplers. Besides, we can also source for you.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier