Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Base Plate Beam Coupler

Product Details
Customization: Available
Material: Steel
Type: Mobile
Still deciding? Get samples of US$ 0/Piece
Request Sample

360° Virtual Tour

Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
27
Year of Establishment
2009-04-24
  • Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Base Plate Beam Coupler
  • Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Base Plate Beam Coupler
  • Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Base Plate Beam Coupler
  • Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Base Plate Beam Coupler
  • Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Base Plate Beam Coupler
  • Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Base Plate Beam Coupler
Find Similar Products

Basic Info.

Model NO.
48.3MM/48.6MM
Structural Style
Multi-Pole Scaffolding
Framework
Combined Scaffolding
Supporting Mode
Wall Hanging Scaffolding
Lapping Form
Full Scaffolding
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Couplers
Construction Properties
Building Scaffold
Standard
ASTM/ JIS/ En
Application
Construction/ Connect
Surface Treatment
Electro-Galvanized
Make Process
Pressed/ Droped
Weight
0.65-1.5kg
Advantage
Strong
MOQ
500 PCS
Scaffolding Type Part
Scaffolding Coupler
Certificate
ISO 9001
Sample
Free
Transport Package
Packed by Bags and Pallet
Specification
48.3MM/48.6MM
Trademark
TFCO
Origin
Tianjin China
HS Code
73094000
Production Capacity
1000000 Psc/Year

Product Description

Overview
 
Quick Details
 
Name Scaffolding Coupler Application Construction/ Connect
Type Double Coupler; Swivel Coupler; Half Coupler; Put Log Coupler;
Sleeve Coupler; Limpet Coupler; Ladder Clamp; Forged Girder;
Joint Pin; Retaining Coupler; Base Plate; Washer Plate...
Make Process Pressed/ Forged
Material Steel Packing packed by bags and pallet
Size 48.3MM / 48.6MM Advantage Strong
Weight 0.5kg- 2.0kg Sample  Free
Surface Electro-Galvanized MOQ 500 PCS
Standard ASTM; JIS; EN Brand TFCO
Certificate ISO 9001 Port Tianjin China
 
Packing & Delivery
 
Packing Packing by Bags and pallet Or Box
 
Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Base Plate Beam Coupler
Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Base Plate Beam Coupler


 
Delivery According to Order Quantity

Type of Scaffolding Coupler
 
Double Coupler Forged Girder
Swivel Coupler Joint Pin
Half Coupler Retaining Coupler
Put Log Coupler Base Plate
Sleeve Coupler Screw Set
Limpet Coupler Water Stop
Ladder Clamp Steel Cone
Washer Plate U Clip
 
Scaffolding Coupler Images


Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Base Plate Beam Coupler
Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Base Plate Beam Coupler
Scaffolding Coupler Packing & Shipping

Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Base Plate Beam Coupler
 
Company Profile

Tianjin Friend Steel Group with "TFCO" Brand has 5 subsidiary compainies include Tianjin Friend Steel Pipe Co.,Ltd&Tianjin Steel Galvanization Co.,Ltd&Tianjin Friend Metal Material Co.,Ltd&Tianjin Friend Import&Export Co., Ltd&Tianjin Steel Import&Export Co., Ltd. Built in 1999 with registered capital of RMB 30 million, we have an annual production capacity of 400,000 MT and exporting quatity of 60,000MT.

Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Base Plate Beam Coupler
Our Honor

Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Base Plate Beam Coupler
 
Our Team

Scaffolding Couplers Building Scaffold Packed by Bags and Pallet Base Plate Beam Coupler

FAQ
 
1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .


2. Q: What's your packing methods?
A: Packed in bundle or bulk or bags (customed is accepted).


3. Q: What's your delivery time?
A: 10-20 days after received the advance payment .


4. Q: Are you manufacturer or trader?
A: We are a professional steel product manufacturer with more than 15 years of export experience.

5. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing), close to Tianjin Port

6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

7. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier