High Formwork Construction Scaffold Heavy Duty Light Pre-Glavanized Hot-Galvanized Jack Scaffolding

Product Details
Customization: Available
Material: Steel
Type: Mobile
Still deciding? Get samples of US$ 0/Piece
Request Sample

360° Virtual Tour

Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
27
Year of Establishment
2009-04-24
  • High Formwork Construction Scaffold Heavy Duty Light Pre-Glavanized Hot-Galvanized Jack Scaffolding
  • High Formwork Construction Scaffold Heavy Duty Light Pre-Glavanized Hot-Galvanized Jack Scaffolding
Find Similar Products

Basic Info.

Model NO.
Heavy Duty / Light Duty
Framework
Combined Scaffolding
Supporting Mode
Floor Type Scaffolding
Lapping Form
High Formwork
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Props
Construction Properties
Building Scaffold
Length
1.8m - 5m
Wall Thickness
1.5mm - 3.5mm
Inner Tube
40mm; 48mm
Outer Tube
48mm; 56mm; 60mm
Surface Treatment
Pre-Galvanized; Hot-Galvanized; Painted; Painted C
Application
Construction; Used for Wall, Girder, Bridge...
Advantage
High Quality; 20 Years Production Experience
Certificate
ISO 9001:2008
Standard
ANSI/ASTM,BS,DIN,Jin,ISO
Place of Origin
Tianjin, China
Supply Ability
2000 Ton / Month
Costomizable
Yes
Kind
Scaffolding Prop; Light Duty; Heavy Duty
Packing
Steel Strips
Shipping
Container
Transport Package
Container
Specification
20ft & 40ft
Trademark
TFCO
Origin
Tianjin, China
HS Code
73084000
Production Capacity
100, 0000 Sets/Year

Product Description

Overview

 
Quick Details
Type Scaffolding Prop; Light Duty; Heavy Duty Packing Bundle
Brand Name TFCO Application Construction; Used for Wall, Girder, Bridge...
Material  Q235/Q345 Advantage High Quality; 20 years production experience
Wall Thickness 1.5MM - 3.5 MM; As customers requirement Certificate ISO 9001:2008
Length 1.8M - 5M; As customers requirement Standard ANSI/ASTM,BS,DIN,JIN,ISO
Surface Treatment Pre-galvanized; Hot-galvanized; Painted; Painted coated Place of Origin Tianjin, China
Inner Tube 40 MM; 48 MM;  Supply Ability 2000 Ton / Month
Outer Tube 48 MM; 56 MM; 60MM Costomizable Yes
 
Packing & Delivery
Packing Packing by steel strips
High Formwork Construction Scaffold Heavy Duty Light Pre-Glavanized Hot-Galvanized Jack Scaffolding
High Formwork Construction Scaffold Heavy Duty Light Pre-Glavanized Hot-Galvanized Jack Scaffolding
 
Delivery According to Order Quantity


 
Detail Size of Prop

 
Heavy Duty Prop
MIN MAX Inner Tube Outer Tube
1.8 M 3.2 M 48 * 2.0 MM 60 * 2.0 MM
2.0 M 3.6 M 48 * 2.0 MM 60 * 2.0 MM
2.2 M 4.0 M 48 * 2.0 MM 60 * 2.0 MM
2.5 M 4.5 M 48 * 2.0 MM 60 * 2.0 MM
3.0 M 5.0 M 48 * 2.0 MM 60 * 2.0 MM
 
Light Duty Prop
MIN MAX Inner Tube Outer Tube
1.7 M 3.0 M 40 * 2.0 MM 48 * 2.0 MM
48 * 2.0 MM 56 * 2.0 MM
1.8 M 3.2 M 40 *2.0 MM 48 * 2.0 MM
48 * 2.0 MM 56 * 2.0 MM
2.0 M 3.6 M 40 * 2.0 MM 48 * 2.0 MM
48 * 2.0 MM 56 * 2.0 MM
 
Steel Prop Images

 
High Formwork Construction Scaffold Heavy Duty Light Pre-Glavanized Hot-Galvanized Jack Scaffolding
High Formwork Construction Scaffold Heavy Duty Light Pre-Glavanized Hot-Galvanized Jack Scaffolding

Steel Prop Packing & Shipping


High Formwork Construction Scaffold Heavy Duty Light Pre-Glavanized Hot-Galvanized Jack Scaffolding
 
Company Profile


Tianjin Friend Steel Group with "TFCO" Brand has 5 subsidiary compainies include Tianjin Friend Steel Pipe Co.,Ltd&Tianjin Steel Galvanization Co.,Ltd&Tianjin Friend Metal Material Co.,Ltd&Tianjin Friend Import&Export Co., Ltd&Tianjin Steel Import&Export Co., Ltd. Built in 1999 with registered capital of RMB 30 million, we have an annual production capacity of 400,000 MT and exporting quatity of 60,000MT.
High Formwork Construction Scaffold Heavy Duty Light Pre-Glavanized Hot-Galvanized Jack Scaffolding
Our Honor


High Formwork Construction Scaffold Heavy Duty Light Pre-Glavanized Hot-Galvanized Jack Scaffolding



 
Our Team


High Formwork Construction Scaffold Heavy Duty Light Pre-Glavanized Hot-Galvanized Jack Scaffolding
FAQ

 
1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .


2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted).


3. Q: What's your delivery time?
A: 10-20 days after received the advance payment .


4. Q: Are you manufacturer or trader?
A: We are a professional steel product manufacturer with more than 15 years of export experience.

5. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing), close to Tianjin Port

6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

7. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier